Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
171 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 9 | SH 99 NB FR, Fry to Westheimer Pkwy | FORT BEND | 2026-08-06 | $34,996,279.04 | $32,673,736.13 |
| Rank 2of 11 | US 287; N of Harmon Rd to N of IH 35W | TARRANT | 2026-08-05 | $66,949,776.28 | $66,140,141.56 |
| Rank 4of 7 | UA 90: FM 359 TO W of SH 99 | FORT BEND | 2026-08-05 | $50,296,881.96 | $48,831,300.51 |
| Rank 2of 8 | SH 99NB Fr, Westh pkw to Cinco Ranch blv | FORT BEND | 2026-08-05 | $26,217,697.31 | $25,954,399.85 |
| Rank 4of 6 | IH 35W; Bethesda Rd to Asher Rd | JOHNSON | 2026-07-01 | $69,798,707.64 | $64,374,552.31 |
| Low bidof 11 | SH 99 SB FR, Cinco Ranch Bl to Bay Hill | FORT BEND | 2026-07-01 | $19,505,917.99 | $19,505,917.99 |
| Rank 4of 6 | SS 366 Deck Plaza Structure Extension | DALLAS | 2026-06-02 | $106,159,592.50 | $93,868,232.48 |
| Rank 5of 7 | Sergio Ivan Rodriguez Pedestrian Bridge | HARRIS | 2026-06-02 | $6,857,738.25 | $4,349,108.00 |
| Rank 9of 10 | SH 99, IH 10W to West Rd (Seg E) | HARRIS | 2026-04-08 | $143,791,906.89 | $119,970,903.36 |
| Rank 3of 9 | US 67 AT LAKE RIDGE PKWY. | ELLIS | 2026-03-04 | $66,338,015.65 | $63,703,073.56 |
| Rank 5of 9 | SS 348 at IH 35E NB | DALLAS | 2026-03-04 | $18,525,941.64 | $16,606,596.57 |
| Rank 13of 14 | US 90 BRIDGE REPLACEMENT 2304-1 | COLORADO | 2026-02-05 | $5,865,235.19 | $3,715,521.15 |
| Rank 5of 12 | FM 549 FROM SH 205 TO SH 276 | ROCKWALL | 2026-02-04 | $33,779,105.36 | $29,812,033.71 |
| Low bidof 10 | US 290: AT SKINNER RD | HARRIS | 2026-02-04 | $74,036,474.93 | $74,036,474.93 |
| Rank 7of 11 | SS 394 From IH 35E to FM 877 | ELLIS | 2026-02-04 | $23,570,223.31 | $18,932,077.24 |
| Rank 7of 10 | IH20,FM2087-SABINERVR,EBLDECK | GREGG | 2025-09-05 | $44,068,020.78 | $36,971,034.60 |
| Rank 8of 8 | FM 636 at Willow Creek | NAVARRO | 2025-09-05 | $12,490,378.62 | $9,649,382.36 |
| Rank 8of 10 | US 77 at 0.1 Mi. South of N. Jaeger St. | LEE | 2025-08-07 | $17,553,803.25 | $13,219,085.43 |
| Rank 4of 9 | SH 71 - TRAVIS C/L to E. of TUCKER HILL | BASTROP | 2025-06-04 | $63,659,154.49 | $58,558,558.86 |
| Rank 8of 8 | FM 547 FROM US 380 TO FM 6 | COLLIN | 2025-05-02 | $24,363,226.97 | $16,422,403.23 |
| Rank 2of 4 | SL 360 - Courtyard to RM 2222 | TRAVIS | 2025-05-01 | $7,395,331.92 | $6,242,242.00 |
| Rank 4of 4 | CONSTRUCT NEW ROADWAY LANES | COLLIN | 2024-12-03 | $197,084,000.01 | $157,359,015.04 |
| Rank 5of 7 | BRIDGE REPLACEMENT | MEDINA | 2024-11-06 | $14,979,000.00 | $12,823,667.12 |
| Rank 3of 4 | DRAINAGE IMPROVEMENTS | MONTGOMERY | 2024-08-02 | $50,847,715.88 | $42,630,751.17 |
| Rank 4of 8 | WIDEN ROAD - ADD LANES | BEXAR | 2024-08-02 | $16,594,642.00 | $16,250,382.92 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.