Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
283 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 5 | GRADE, ACP, STR, MBGF, PAV MRKS, SIGNS | LASALLE | 2020-05-08 | $15,239,642.92 | $15,239,642.92 |
| Rank 4of 5 | CONSTR NB PASSING LNS; BASE REPAIR, SC & OVERLAY | WILSON | 2020-03-05 | $14,280,682.80 | $12,527,098.06 |
| Low bidof 6 | BASE,GRADE,ACP,PAV MARK | WEBB | 2020-02-07 | $3,148,791.36 | $3,148,791.36 |
| Low bidof 4 | SPOT BASE REPAIR | ZAVALA | 2020-02-07 | $1,349,226.00 | $1,349,226.00 |
| Low bidof 2 | ACP, PAV MRKS, PLANING | VAL VERDE | 2020-02-06 | $8,302,881.12 | $8,302,881.12 |
| Low bidof 2 | OVERLAY | HIDALGO | 2020-02-06 | $9,929,404.50 | $9,929,404.50 |
| Rank 2of 3 | BASE,ACP,GRAD,STR,PAV MRK | LASALLE | 2019-12-03 | $67,475,258.72 | $67,316,512.36 |
| Rank 2of 3 | OVERLAY, MILLING AND PAVEMENT MARKINGS | BROOKS | 2019-12-03 | $4,085,483.85 | $3,795,358.53 |
| Rank 2of 2 | NEW LOCATION FREEWAY | HIDALGO | 2019-10-03 | $106,666,290.13 | $95,994,022.81 |
| Rank 2of 3 | CONSTRUCT NEW ROADWAY LANES | JIM WELLS | 2019-10-02 | $82,504,436.40 | $78,425,429.45 |
| Rank 2of 2 | REHAB & WIDENING EXISTING ROADWAY | CAMERON | 2019-08-07 | $22,274,111.15 | $19,989,898.05 |
| Low bidof 2 | BASE,ACP,GRAD,STR,PAV MRK | WEBB | 2019-08-06 | $68,572,893.01 | $68,572,893.01 |
| Rank 3of 3 | REHABILITATION OF EXISTING ROADWAY | HIDALGO | 2019-08-06 | $12,256,361.78 | $10,978,592.66 |
| Rank 4of 5 | BRIDGE MAINTENANCE | HIDALGO | 2019-08-06 | $2,334,387.50 | $1,760,707.62 |
| Low bidof 3 | REHAB & WIDEN TO PROVIDE PASS LNS & OP IMPROV | FRIO | 2019-06-05 | $22,794,970.10 | $22,794,970.10 |
| Low bidof 3 | GRD, BSE, SURF, PAV'T MRK | FRIO | 2019-06-05 | $18,027,137.64 | $18,027,137.64 |
| Rank 3of 3 | REHAB & WIDEN TO PROVIDE PASS LNS & OP IMPROVEMENT | FRIO | 2019-06-04 | $38,361,597.75 | $35,430,890.75 |
| Low bidof 4 | BASE REPAIR, SEALCOAT, OVERLAY & PAV MRK ON MAINLN | FRIO | 2019-05-08 | $25,532,106.02 | $25,532,106.02 |
| Low bidof 2 | BASE,ACP,GRAD,STR,PAV MRK | WEBB | 2019-04-03 | $23,429,428.64 | $23,429,428.64 |
| Rank 5of 6 | BS RPR, SC, OVLY & PAV MRKS ON MAINLANES | ATASCOSA | 2019-03-06 | $14,840,013.61 | $12,910,717.48 |
| Rank 6of 7 | GRADING, STRUCTURES, BASE & SURFACE | COMAL | 2019-02-06 | $28,420,801.14 | $25,398,550.72 |
| Rank 10of 14 | EXPAND FROM 2 LANES TO 4 LANE DIVIDED | BEXAR | 2019-02-05 | $22,314,679.37 | $20,172,901.99 |
| Low bidof 2 | RESURFACE OF EXISTING HIGHWAY | WEBB | 2019-01-09 | $12,256,476.31 | $12,256,476.31 |
| Low bidof 4 | REHABILITATE EXISTING ROADWAY | FRIO | 2019-01-09 | $1,754,395.66 | $1,754,395.66 |
| Rank 4of 4 | GRAD, BSE, SURF, PAV'T MRKNG | MCMULLEN | 2018-12-06 | $28,692,661.72 | $23,420,629.46 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.