0603066.05HANGER RETROFIT (SPANS 5-7) ** See Special Provisions **
21 ea.
$95,000
$2.00M
11%
0975004MOBILIZATION AND PROJECT CLOSEOUT
1 LS
$1,854,340
$1.85M
10%
0603161FIELD DIRECTED STEEL REPAIRS (ESTIMATED COST) ** See Special Provisions **
1,530,700 est.
$1
$1.53M
8%
0603070.05ADJUSTABLE UPPER DIAGONAL RETROFIT (SPANS 5-7) ** See Special Provisions **
16 ea.
$90,000
$1.44M
8%
0603071.05ADJUSTABLE LOWER DIAGONAL RETROFIT (SPANS 5-7) ** See Special Provisions **
Project details
Type of work
Bridge
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
23 ea.
$60,000
$1.38M
7%
0603659REPLACE REMOVED OR MISSING RIVETS AND BOLTS WITH HIGH STRENGTH BOLTS ** See Special Provisions **
1,545 ea.
$650
$1.00M
5%
0100600.05CONSTRUCTION ACCESS (SPAN 5) ** See Special Provisions **
1 LS
$940,000
$940k
5%
0100600.06CONSTRUCTION ACCESS (SPAN 6) ** See Special Provisions **
1 LS
$940,000
$940k
5%
0100600.07CONSTRUCTION ACCESS (SPAN 7) ** See Special Provisions **
1 LS
$940,000
$940k
5%
0100600.01CONSTRUCTION ACCESS (SPAN 1) ** See Special Provisions **