0101 1 1MOBILIZATION- FOR WORK ORDER/PUSH BUTTON CONTRACTS (DO NOT BID) 44081645204
1 LS
$110,801
$111k
9%
0634 4153SPAN WIRE ASSEMBLY, F&I, TWO POINT, BOX OR DROP BOX
6 PI
$15,124
$91k
7%
0653 1 11PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 1 WAY
Project details
Type of work
Signals
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
66 AS
$1,331
$88k
7%
0634 4152SPAN WIRE ASSEMBLY, F&I, TWO POINT, DIAGONAL
8 PI
$9,576
$77k
6%
0632 7 6SIGNAL CABLE, REMOVE- INTERSECTION
14 PI
$4,903
$69k
6%
0634 4600SPAN WIRE ASSEMBLY, REMOVE- POLES REMAIN
14 PI
$4,903
$69k
6%
0650 1 29VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE W ALUMIN, 5 SECTION CLUSTER, 1 WAY
23 AS
$2,964
$68k
6%
0665 1 11PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD