Skip to content
Figure 0.1 · BRIEFING
BID #E6P81 · FDOTRESULT · awarded May 28

Miami-Dade — Push ButtonDrainage ImprovementPrequalification is required.

Miami-Dade County

Bid dateThursday, May 28
read → connected → answeredcassandri

Project scope

Typical scope · median of 10 comparable bids (FDOT drainage, last 24 mo)

102ITEMS
  • 0001 Utilities38%
  • 0001 Roadway22%
  • 0002 Signing8%
  • 0003 Signalization8%
  • 0004 Signalization7%
  • 0006 Utilities5%
  • Other13%

Cost concentration table renders only when the active letting’s own line items are present. The donut above is aggregated from 10 historical comparable bids.

Project details

Description
Push ButtonDrainage ImprovementPrequalification is required.

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →