REHOBOTH- DECK REPLACEMENT, R-04-018 (3U4, 3U5), I-195 (EB/WB) OVER PALMER RIVER · MassDOT 613106 · Cassandri
Figure 0.1 · BRIEFINGBID #613106 · MassDOTPRE‑BID · 9 DAYS
REHOBOTH- DECK REPLACEMENT, R-04-018 (3U4, 3U5), I-195 (EB/WB) OVER PALMER RIVER
est $9.2M
Bid dateSaturday, July 25—
Who’s bidding this
No plans pulled yet
Likely also biddingMA bridge regulars · 8
J. H. Maxymillian Inc.100% · 6/6
Mig Corporation4 bids · small sample
Northern Construction Service LLC4 bids · small sample
New England Infrastructure INC3 bids · small sample
Tully Construction CORP3 bids · small sample
Mas Building & Bridge INC3 bids · small sample
J H Lynch & Sons INC2 bids · small sample
Atsalis Brothers Painting Comp2 bids · small sample
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid MA bridge work in the last 5 years, ranked by frequency. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
Project details
Description
The project involves removal of the existing non-composite bridge deck and replacement with a new 8” thick reinforced concrete composite bridge deck. The existing bridge railings will be replaced with new CF-MTL5 reinforced concrete bridge barriers. The width of the proposed bridge deck is 57’-2” with a roadway width of 53’-7 ½”. This project also involves the following. Replacement of all existing steel bridge bearings with proposed elastomeric bearings. Inspection of top cover plate end weld for fatigue cracks and repairs as required based on the inspections. Installation of steel bearing stiffeners at the east abutments only. Installation of new steel diaphragms in each bay offset 5’-0” from the centerline of each pier. Installation of new steel diaphragms in the stage construction bay. Modification of east backwall to support new bridge joint. Concrete repairs to bridge abutments, backwalls and pier. Work in the approach roadways shall include full depth reconstruction, bridge barrier to highway guardrail transitions, and highway guardrail. The demolition/construction will be conducted with staged construction so that two lanes of traffic are being maintained at all times.
Type of work
Bridge deck replacement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →