ADAMS- RECONSTRUCTION OF HOWLAND AVENUE (ROUTE 8) AND LIME STREET · MassDOT 613657 · Cassandri
Figure 0.1 · BRIEFINGBID #613657 · MassDOTPRE‑BID · 1818 DAYS
ADAMS- RECONSTRUCTION OF HOWLAND AVENUE (ROUTE 8) AND LIME STREET
est $17M
Bid dateSaturday, May 24—
Project details
Description
A "road-diet" is proposed for approx. one mile on Howland Avenue (municipally owned Route 8) in Adams. Proposed design consists of two travel lanes, a two-way-left-turn-lane (with some left-turn bays), and 5-ft shoulders from curb to curb. A buffered 10-ft shared use path is proposed on the west side of the highway and a buffered 6-ft sidewalk is proposed on the east side. Another design alternative, consisting of two 8-ft shared-use paths, is also being considered. Also included is approximately 2,100-ft of roadway rehabilitation and a new buffered shared use path on the north side of Lime Street to provide connectivity to the existing northern terminus of the Ashuwillticook Rail Trail.
Type of work
Roadway modernization
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →