5604-09 (TH 210=183), 7701-40 (TH 210=183) NHPP 0210(316) In Otter Tail and Todd Counties on TH 210 from TH 29 to 0.08 Miles W. of TH 71Grading, Bituminous Milling, and Bituminous Surfacing 10.638 Miles · MnDOT 250016 · Cassandri
Published projectBID #250016 · MnDOTRESULT · bids opened Feb 26
5604-09 (TH 210=183), 7701-40 (TH 210=183) NHPP 0210(316) In Otter Tail and Todd Counties on TH 210 from TH 29 to 0.08 Miles W. of TH 71Grading, Bituminous Milling, and Bituminous Surfacing 10.638 Miles
2582503/401066" SOLID LINE MULTI-COMPONENT GROUND IN (WR)
114,289 L F
$1.05
$120k
4%
Project details
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →