2110-10 (T.H. 114=208), 2111-10 (TH 114=208), 6112-12 (TH 114=208), 2101-55 (TH 27=205) HSIP-STBG 2125(086) In Pope and Douglas Counties on T.H. 114 from T.H. 55 to T.H. 94 and on T.H. 27 from 977' W of TH 114 to 823' E of TH 114 Grading, Bituminous and Concrete Surfacing, Roundabout, ADA Improvements and Lighting 13.086 Miles
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$225
$213k
5%
2106507/00010EXCAVATION - COMMON
21,842 C Y
$9
$197k
4%
2104504/00120REMOVE BITUMINOUS PAVEMENT
28,403 S Y
$4.5
$128k
3%
2545501/00100LIGHTING SYSTEM
1 LS
$122,500
$123k
3%
2021501/00010MOBILIZATION
1 LS
$117,655
$118k
3%
2110-10 (T.H. 114=208), 2111-10 (TH 114=208), 6112-12 (TH 114=208), 2101-55 (TH 27=205) HSIP-STBG 2125(086) In Pope and Douglas Counties on T.H. 114 from T.H. 55 to T.H. 94 and on T.H. 27 from 977' W of TH 114 to 823' E of TH 114 Grading, Bituminous and Concrete Surfacing, Roundabout, ADA Improvements and Lighting 13.086 Miles · MnDOT 250025 · Cassandri