8827-379 (T.H. 90) NHPP I900(147) In Various Counties on T.H. 90 from T.H. 23 to T.H. 71 Traffic Management System 73.29 Miles
Jackson, Nobles, Rock County · est $1.2M
Bid dateWednesday, September 24—
Jackson, Nobles, Rock County · est $1.2M
Bid tab · MnDOT
44 published pay items from the MnDOT bid tab. The bid tab does not identify a reliable low-bid rank, so item prices are withheld.
| 2011601/01000 | AS BUILT | 1 LS |
| 2021501/00010 | MOBILIZATION | 1 LS |
| 2104502/01000 | REMOVE LIGHT POLE | 10 EACH |
| 2104502/01220 | REMOVE SIGN | 1 EACH |
| 2104502/01370 | REMOVE SERVICE INSTALLATION | 2 EACH |
| 2104502/01510 | REMOVE FLASHER SIGNAL | 2 EACH |
| 2104502/01580 | REMOVE LIGHT FOUNDATION | 16 EACH |
| 2104502/01640 | REMOVE CABINET |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2 EACH |
| 2104502/02920 | SALVAGE LIGHTING UNIT | 6 EACH |
| 2104502/03300 | SALVAGE SIGN | 1 EACH |
| 2104502/03555 | SALVAGE I-BEAM SIGN | 2 EACH |
| 2104602/00300 | REMOVE SIGN SPECIAL | 12 EACH |
| 2545502/14080 | LIGHT FOUNDATION DESIGN E | 27 EACH |
| 2545502/14090 | LIGHT FOUNDATION DESIGN E MODIFIED | 16 EACH |
| 2550502/00010 | PEDESTAL FOUNDATION | 6 EACH |
| 2550502/00011 | CABINET FOUNDATION 334Z | 9 EACH |
| 2550502/00020 | CABINET FOUNDATION | 14 EACH |
| 2550502/00240 | RAMP CONTROL SIGNAL DESIGN MODIFIED | 27 EACH |
| 2550502/00251 | FLASHER SIGNAL DESIGN MODIFIED | 4 EACH |
| 2550502/03450 | SERVICE CABINET | 14 EACH |
| 2550503/00140 | 1.5" NON-METALLIC CONDUIT | 7,150 L F |
| 2550503/00153 | 2" NON-METALLIC CONDUIT | 2,785 L F |
| 2550503/00178 | 3" NON-METALLIC CONDUIT | 140 L F |
| 2550503/01060 | POWER CABLE 1 CONDUCTOR NO 6 | 2,820 L F |
| 2550503/03080 | POWER CABLE 3 CONDUCTOR NO 8 | 14,525 L F |
| 2550503/03140 | POWER CABLE 3 CONDUCTOR NO 14 | 6,750 L F |
| 2550602/03463 | MODIFY SERVICE EQUIPMENT | 9 EACH |
| 2550602/03479 | INSTALL CABINET | 23 EACH |
| 2550602/03835 | FLASHER SIGNAL-SOLAR POWER | 6 EACH |
| 2550602/04080 | BARRIER ARM GATE | 16 EACH |
| 2550603/68040 | 1.5" BORED CONDUIT | 1,000 L F |
| 2550603/68053 | 2" BORED CONDUIT | 1,585 L F |
| 2550603/68078 | 3" BORED CONDUIT | 1,020 L F |
| 2563601/00010 | TRAFFIC CONTROL | 1 LS |
| 2564602/01515 | INSTALL SIGN | 1 EACH |
| 2564602/01650 | INSTALL I-BEAM SIGN | 2 EACH |
| 2564608/00050 | STRUCTURAL STEEL - I-BEAM SIGN | 12,212 LB |
| 2564618/00020 | SIGN PANEL | 727 S F |
| 2564618/00025 | SIGN PANEL OVERLAY | 1,113 S F |
| 2564618/00100 | EXTRUDED PANEL | 823 S F |
| 2565602/00021 | HANDHOLE | 47 EACH |
| 2565602/00046 | PEDESTAL POLE AND BASE | 33 EACH |
| 2573503/00061 | SEDIMENT CONTROL LOG TYPE WOOD FIBER | 2,650 L F |
| 2575501/00020 | TURF ESTABLISHMENT | 1 LS |