2905-39 (T.H. 71=4) BFP 2926(016) In Hubbard County on T.H. 71 at 400' North of Hay Creek Drive Grading, Bituminous Surfacing and Bridge No. 29X05 · MnDOT 250095 · Cassandri
Published projectBID #250095 · MnDOTRESULT · bids opened Aug 20
2905-39 (T.H. 71=4) BFP 2926(016) In Hubbard County on T.H. 71 at 400' North of Hay Creek Drive Grading, Bituminous Surfacing and Bridge No. 29X05
Hubbard County · est $2.5M
Bid dateWednesday, August 20—
Low bidGladen Construction, Inc.$2.08M
Checking Workspace access…
Project scope
Bid tab · MnDOT
Share of pay items by category
SP 2905-39100%
Top items by low bid
Item
Qty
Unit price
Extended
%
2412503/1211012X11 PRECAST CONCRETE BOX CULVERT
356 L F
$1,620
$577k
28%
2021501/00010MOBILIZATION
1 LS
$216,000
$216k
10%
2412502/1211012X11 PRECAST CONCRETE BOX CULVERT END SECTION
4 EACH
$51,100
$204k
10%
2106507/00080SELECT GRANULAR EMBANKMENT (CV)
10,829 C Y
$14.2
$154k
7%
2452601/00011STEEL SHEET PILING (TEMPORARY)
1 LS
$150,000
$150k
7%
2106507/00010
Project details
Type of work
Bridge
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →