5212-35 (TH 169=5), 137-152-002, SAP 150-114-007 NHPP-STBG-NHFP-TA 0169(364) In Nicollet & Blue Earth Counties on TH 169 at Belgrade Ave, on Belgrade Ave from Wall St to Minnesota River and on Mullberry St form Minnesota River to 190' West of N 2nd St Grading, Bituminous and Concrete Surfacing, Moment Slab, ADA Improvements, TMS, Signal, Lighting and Br No 52009, 07042 0.332 Miles · MnDOT 250119 · Cassandri
Published projectBID #250119 · MnDOTRESULT · bids opened Dec 3
5212-35 (TH 169=5), 137-152-002, SAP 150-114-007 NHPP-STBG-NHFP-TA 0169(364) In Nicollet & Blue Earth Counties on TH 169 at Belgrade Ave, on Belgrade Ave from Wall St to Minnesota River and on Mullberry St form Minnesota River to 190' West of N 2nd St Grading, Bituminous and Concrete Surfacing, Moment Slab, ADA Improvements, TMS, Signal, Lighting and Br No 52009, 07042 0.332 Miles
Blue Earth, Nicollet County · est $28M
Bid dateWednesday, December 3—
Low bidAmes Construction, Inc.$21.3M
Checking Workspace access…
Project scope
Bid tab · MnDOT
Share of pay items by category
SP 5212-3578%
BRIDGE #0704217%
BRIDGE #520096%
Top items by low bid
Item
Qty
Unit price
Extended
%
2401518/14001BRIDGE SLAB CONCRETE (3YHPC-M)
101,250 S F
$27
$2.73M
13%
2478518/00020ORGANIC ZINC-RICH PAINT SYSTEM (FIELD)
112,920 S F
$19.5
$2.20M
10%
2433601/08010SUPPLEMENTAL DESCRIPTION WORK PLATFORM
1 LS
$2,130,000
Project details
Type of work
Signals
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$2.13M
10%
2021501/00010MOBILIZATION
1 LS
$1,931,000
$1.93M
9%
2433518/00007REMOVE CONCRETE SLAB, CURBS, OVERLAY, AND BARRIER