2680-44 (TH 94=392), 2180-123 (TH 94=392) NHPP I940(063) In Grant and Douglas Counties on TH 94 WB from 0.5 Miles E of Otter Tail County Line to 0.3 Miles E of TH 79 Grading, Bituminous Milling, Concrete & Bituminous Surfacing, Unbonded Concrete Overlay and Bridge No. 26801, 26802, 26803 11.464 Miles · MnDOT 260006 · Cassandri
2680-44 (TH 94=392), 2180-123 (TH 94=392) NHPP I940(063) In Grant and Douglas Counties on TH 94 WB from 0.5 Miles E of Otter Tail County Line to 0.3 Miles E of TH 79 Grading, Bituminous Milling, Concrete & Bituminous Surfacing, Unbonded Concrete Overlay and Bridge No. 26801, 26802, 26803 11.464 Miles
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
MOBILIZATION
1 LS
$1,127,000
$1.13M
5%
2363509/00010BIT MIX FOR PERM ASPHALT STABILIZED STRESS RELIEF