SP 2110-11 (TH 114=208), SP 6112-13 (TH 114=208), SP 2111-11 (TH 114=208) STBG 2127(004) In Pope & Douglas Counties on T.H. 114 From T.H. 55 to 610' S. of T.H. 27 and on T.H. 114 From 587' N. of T.H. 27 to 340' N. of T.H. 94 Grading, Bituminous Mill and Overlay 12.517 · MnDOT 260012 · Cassandri
SP 2110-11 (TH 114=208), SP 6112-13 (TH 114=208), SP 2111-11 (TH 114=208) STBG 2127(004) In Pope & Douglas Counties on T.H. 114 From T.H. 55 to 610' S. of T.H. 27 and on T.H. 114 From 587' N. of T.H. 27 to 340' N. of T.H. 94 Grading, Bituminous Mill and Overlay 12.517
2582503/401066" SOLID LINE MULTI-COMPONENT GROUND IN (WR)
159,982 L F
$0.92
$147k
4%
2118509/00020AGGREGATE SURFACING CLASS 1 MOD
8,225 TON
$17.5
$144k
4%
2564518/00010SIGN
1,443 S F
$55.18
Project details
Type of work
Pavement
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →