Skip to content
Figure 0.1 · BRIEFING
BID #F01 · MoDOTPRE‑BID · 19 DAYS

ST LOUIS County: (1): Job J6I3020D Route I-270 ST LOUIS County. Bridge replac

ST LOUIS County

Bid dateThursday, June 18
read → connected → answeredcassandri

Project scope

Typical scope · median of 40 comparable bids (MoDOT bridge, last 24 mo)

226ITEMS
  • 0001 Roadway Items - JSL02081%
  • 0001 Roadway Items - JSR0195 AND JSU01981%
  • 0001 Roadway Items - JKU01251%
  • 0001 Roadway Items - J9S36891%
  • 0001 Roadway Items - JKU00381%
  • 0001 Roadway Items - JCD00731%
  • Other94%

Cost concentration table renders only when the active letting’s own line items are present. The donut above is aggregated from 40 historical comparable bids.

Project details

Description
(1): Job J6I3020D Route I-270 ST LOUIS County. Bridge replacement, 2 walls, add pavement widening and ADA from west of Lilac Avenue to Riverview Drive in St. Louis, the total length of improvement being 0.938 miles. (2): Job J6I3580B Route I-270 ST LOUIS County. Coldmill and resurface from west of Route 367 to east of Lilac Avenue in St. Louis, the total length of improvement being 2.375 miles. (3): Job JSL0021 Route I-270 ST LOUIS County. 4 Bridge replacements, 2 walls and pavement widening from west of Route 367 to east of Bellefontaine Road in St. Louis, the total length of improvement being 1.719 miles.

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →