Skip to content
Figure 0.1 · BRIEFING
BID #HS-2401P · NCDOTRESULT · awarded May 19

HERTFORD — US 158 / US 258 AT SR 1157 (CHARLIE POWELL ROAD), AT SR 1230 (CLOVER CIRCLE), AND AT SR 1160 (BENTHALL BRIDGE ROAD) NEAR MURFREESBORO. CONSTRUCT REDUCED CONFLICT INTERSECTIONS.

HERTFORD County · est $5.1M · plans pulled by 7 GCs

Plan pull7 GCs, of which 5 repeatMay 13
PatternWooten + Barnhill typically win Div 1 RCI packagesconf. 0.68
Bid dateTuesday, May 19
read → connected → answeredcassandri

Project scope

Typical scope · median of 16 comparable bids (NCDOT bridge, last 24 mo)

137ITEMS
  • SP18%
  • 12052%
  • 8621%
  • 8151%
  • 11901%
  • 8001%
  • Other74%

Cost concentration table renders only when the active letting’s own line items are present. The donut above is aggregated from 16 historical comparable bids.

Project details

Description
US 158 / US 258 AT SR 1157 (CHARLIE POWELL ROAD), AT SR 1230 (CLOVER CIRCLE), AND AT SR 1160 (BENTHALL BRIDGE ROAD) NEAR MURFREESBORO. CONSTRUCT REDUCED CONFLICT INTERSECTIONS.

How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →