Bridge Repair
Henry County
Bid dateThursday, June 11—
Henry County
Bid form · ODOT
Cost concentration table renders only when the active letting’s own line items are present. The donut above is aggregated from this bid.
As advertised by ODOT — 32 pay items with quantities and units. Contractor unit prices appear here once bids open.
| # | Item | Description | Quantity |
|---|---|---|---|
| 1 | 202E38000 | GUARDRAIL REMOVED | 337.5 FT |
| 2 | 202E42040 | ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH |
| 3 | 202E42050 | ANCHOR ASSEMBLY REMOVED, TYPE B | 1 EACH |
| 4 | 202E47000 | BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH |
| 5 | 202E98000 | REMOVAL MISC.:PORTABLE CONCRETE BARRIER AND IMPACT ATTENUATOR | Lump sum |
| 6 | 606E15050 | GUARDRAIL, TYPE MGS | 300 FT |
| 7 | 606E26050 | ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH |
| 8 | 606E26550 | ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH |
| 9 | 606E35002 | MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH |
| 10 | 606E35102 | MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH |
| 11 | 626E00102 | BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 3 EACH |
| 12 | 626E00116 | BARRIER REFLECTOR, TYPE 5 (ONE-WAY) | 10 EACH |
| 13 | 832E30000 | EROSION CONTROL | 1,000 EACH |
| 14 | 614E11110 | LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSISTANCE | 80 HOUR |
| 15 | 614E11630 | INCREASED BARRIER DELINEATION | 400 FT |
| 16 | 614E12380 | WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS, (UNIDIRECTIONAL) | 1 EACH |
| 17 | 614E12500 | REPLACEMENT SIGN | 1 EACH |
| 18 | 614E12600 | REPLACEMENT DRUM | 3 EACH |
| 19 | 614E13310 | BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 9 EACH |
| 20 | 614E13350 | OBJECT MARKER, ONE WAY | 9 EACH |
| 21 | 614E18601 | PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT |
| 22 | 614E22210 | WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.4 MILE |
| 23 | 614E24402 | WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 850 FT |
| 24 | 622E41100 | PORTABLE BARRIER, UNANCHORED | 400 FT |
| 25 | 202E11200 | PORTIONS OF STRUCTURE REMOVED | Lump sum |
| # | Item | Description | Quantity |
|---|---|---|---|
| 26 | 509E10000 | EPOXY COATED STEEL REINFORCEMENT | 156 LB |
| 27 | 510E10000 | DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 6 EACH |
| 28 | 511E34448 | CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 2 CY |
| 29 | 512E10050 | SEALING OF CONCRETE SURFACES (NON-EPOXY) | 56 SY |
| 30 | 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 31 | 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 32 | 624E10000 | MOBILIZATION | Lump sum |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →