2027 Darlington Pavement Improvement
Darlington County
Darlington County
No plans pulled yet · Satterfield Construction Company, INC. finishes low on 94% of SC pavement bids it enters
Likely also biddingSC pavement regulars · 8
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid SC pavement work in the last 5 years, ranked by frequency. Low-bid rate is historical — the share of bids where that firm finished rank one, not a verified award or a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · SCDOT
46 advertised pay items from the SCDOT bid form. Open a category to see its items — unit prices appear here once bids open.
| HMA SHOULDER WIDENING COURSE | 10,326.976 TON | |
| LIQUID ASPHALT BINDER PG64-22 | 2,796.518 TON | |
| MILLING EXISTING ASPHALT PAVEMENT 2.0" | 186,049 SY | |
| MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) | 375 SY | |
| ASPHALT SURFACE COURSE TYPE B | 18,604.817 TON | |
| ASPHALT SURFACE COURSE TYPE C | 17,793.584 TON | |
| ASPHALT SURFACE COURSE TYPE D | 704 TON |
| 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT | 715,236 LF | |
| 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT | 495 LF | |
| 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT | 1,551 LF | |
| 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. | 248,412 LF | |
| 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. | 112,302 LF |
| BORROW EXCAVATION | 4,744.6 CY | |
| EXCAVATION FOR SHOULDER PAVING | 2,139.351 STA | |
| HAULING OF EXCAVATED SHOULDER MATERIAL | 2,139.351 STA |
| DRIVEWAY PAVING-SURFACE TYPE D | 1,386.875 TON | |
| 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT | 635 LF |
| MOBILIZATION | 1 LS |
| ARAMID FIBER | 4,602.821 LB |
| TRAFFIC CONTROL | 1 LS |
| PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) | 2,312 SF |
| BONDS AND INSURANCE | 1 LS | |
| MAINTENANCE STONE | 111.5 TON | |
| FULL DEPTH ASPH. PAV. PATCHING 8" UNIF | 6,650 SY | |
| FULL DEPTH ASPH. PAV. PATCHING 10"UNIF | 4,500 SY | |
| 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT | 19,215 LF | |
| WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT | 12 EA | |
| WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT | 6 EA | |
| WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT | 6 EA | |
| WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT | 4 EA | |
| 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT | 55,980 LF | |
| 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT | 336,906 LF | |
| 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. | 6,405 LF | |
| 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. | 165 LF | |
| 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL | 517 LF | |
| WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. |
| 4 EA |
| WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. | 2 EA |
| WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL | 2 EA |
| WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL | 2 EA |
| 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. | 18,660 LF |
| PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" | 256 EA |
| PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. | 38 EA |
| PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" | 1,653 EA |
| MILLED-IN RUMBLE STRIP | 47.24 MI |
| PREMASH TYPE T TL3 LEADING 50' | 2 EA |
| PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS | 16.39 ACRE |