FDP, Mill, STB, Intm B Spec, CMRB
Dorchester County
Bid dateWednesday, September 92:00 pm
Dorchester County
Bid form · SCDOT
75 advertised pay items from the SCDOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT | 213,276 LF | |
| 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT | 239,184 LF | |
| 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT | 2,150 LF | |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT |
| 3,509 LF |
| 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING | 3,786 LF |
| 6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING | 1,430 LF |
| 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING | 67,182 LF |
| 6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING | 91,349 LF |
| 8" WHITE SOLID LINES PERM.PVMT.MARKINGS | 825 LF |
| 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING | 1,489 LF |
| WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING | 50 EA |
| WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING | 35 EA |
| WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING | 4 EA |
| WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING | 2 EA |
| RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING | 10 EA |
| 4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING | 7,934 LF |
| 6" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING | 6,540 LF |
| 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING | 70,030 LF |
| 6" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING | 57,501 LF |
| HMA SHOULDER WIDENING COURSE | 5,343.36 TON | |
| LIQUID ASPHALT BINDER PG64-22 | 2,391.41 TON | |
| MILLING EXISTING ASPHALT PAVEMENT 1.75" | 277,352.002 SY | |
| MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) | 21,145 SY | |
| ASPHALT SURFACE COURSE TYPE B | 34,239.995 TON | |
| ASPHALT SURFACE COURSE TYPE C | 2,357.643 TON |
| DRIVEWAY PAVING-SURFACE TYPE C | 1,985.625 TON | |
| 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT | 2,097 LF | |
| CONCRETE SIDEWALK(4" UNIFORM) | 311.11 SY | |
| CONCRETE SIDEWALK(6" UNIFORM) | 19.44 SY | |
| CONCRETE DRIVEWAY(6" UNIFORM) | 20 SY |
| UNCLASSIFIED EXCAVATION | 237 CY | |
| BORROW EXCAVATION | 3,844.9 CY | |
| EXCAVATION FOR SHOULDER PAVING | 874.4 STA | |
| HAULING OF EXCAVATED SHOULDER MATERIAL | 874.4 STA |
| MOBILIZATION | 1 LS |
| REMOVAL & DISPOSAL OF EXISTING PAVEMENT | 350.55 SY |
| TRAFFIC CONTROL | 1 LS |
| PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) | 3,650.563 SF |
| FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT | 700 LF |
| SAWCUT FOR LOOP DETECTOR | 4,825 LF |
| BONDS AND INSURANCE | 1 LS | |
| CONSTRUCTION STAKES, LINES & GRADES | 11 EA | |
| RAILROAD INSURANCE AND FLAGGING NS | 1 LS | |
| ADDITIONAL ROCK FOR FULL DEPTH RECLAMATION | 592.5 TON | |
| MAINTENANCE STONE | 67.16 TON | |
| CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B | 36,150.398 SY | |
| PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE | 1,446.02 TON | |
| FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. | 479 SY | |
| FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. | 214 SY | |
| FULL DEPTH ASPH. PAV. PATCHING 8" UNIF | 11,231.16 SY | |
| 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT | 8,046 LF | |
| 6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT | 3,810 LF | |
| WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT | 141 EA | |
| WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT | 28 EA | |
| WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT | 97 EA | |
| WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT | 11 EA | |
| WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT | 4 EA | |
| RAILROAD CROSSING SYMBOLS - FAST DRY PAINT | 26 EA | |
| BIKE LANE SYMBOL - FAST DRY PAINT | 28 EA | |
| 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT | 8,680 LF | |
| 6" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT | 19,620 LF | |
| 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT | 199,364 LF | |
| 6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT | 172,503 LF | |
| BIKE LANE SYMBOL -PREFORMED THERMO - 60MIL | 14 EA | |
| BIKE LANE ARROW - PREFORMED THERMO - 60MIL | 14 EA | |
| PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" | 273 EA | |
| PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. | 234 EA | |
| PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" | 1,462 EA | |
| MILLED-IN RUMBLE STRIP | 32.94 MI | |
| FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE | 9,750 LF | |
| F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD | 5 EA | |
| DETECTABLE WARNING MATERIAL | 30 SF | |
| PEDESTRIAN RAMP CONSTRUCTION | 50 SY | |
| SURFACE APPLIED DETECTABLE WARNING | 180 SF | |
| PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS | 15.77 ACRE |