2027 Florence Pavement Improvement
Florence County
Florence County
No plans pulled yet · Satterfield Construction Company, INC. finishes low on 94% of SC pavement bids it enters
Likely also biddingSC pavement regulars · 8
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid SC pavement work in the last 5 years, ranked by frequency. Low-bid rate is historical — the share of bids where that firm finished rank one, not a verified award or a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · SCDOT
72 advertised pay items from the SCDOT bid form. Open a category to see its items — unit prices appear here once bids open.
| REMOVAL & DISPOSAL OF EXISTING CURB | 2,400 LF | |
| DRIVEWAY PAVING-SURFACE TYPE D | 808.13 TON | |
| 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT | 2,345 LF | |
| CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE | 1,050 LF | |
| CONCRETE CURB AND GUTTER (2'-6") VERTICAL FACE | 1,350 LF | |
| CONCRETE SIDEWALK(4" UNIFORM) | 1,425 SY | |
| CONCRETE SIDEWALK(6" UNIFORM) | 1,520 SY | |
| CONCRETE DRIVEWAY(6" UNIFORM) | 1,250 SY |
| HMA SHOULDER WIDENING COURSE | 2,386.54 TON | |
| LIQUID ASPHALT BINDER PG64-22 | 1,968.896 TON | |
| MILLING EXISTING ASPHALT PAVEMENT 1.5" | 9,396 SY | |
| MILLING EXISTING ASPHALT PAVEMENT 2.0" | 256,532 SY | |
| MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) | 780 SY | |
| ASPHALT SURFACE COURSE TYPE B | 27,917.446 TON | |
| ASPHALT SURFACE COURSE TYPE C | 3,955.98 TON | |
| ASPHALT SURFACE COURSE TYPE D | 190 TON |
| ARAMID FIBER | 838.27 LB | |
| SAWCUT FOR LOOP DETECTOR | 7,046 LF | |
| TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT | 9 EA | |
| FURNISH & INSTALL RADAR FOR STOP BAR DETECTION, INC 150' CABLE & | 5 EA | |
| FURNISH & INSTALL RADAR FOR SETBACK DETECTION, INC 150' CABLE & | 2 EA | |
| FURNISH & INSTALL RADAR DETECTION CABLE TO CROSS ROADWAY | 1,500 LF |
| 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT | 207,876 LF | |
| 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT | 6,150 LF | |
| 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT | 3,465 LF | |
| 4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT SLOW CURE | 10,470 LF | |
| 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. | 69,292 LF | |
| 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. | 84,850 LF |
| FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT | 500 LF | |
| FURNISH & INSTALL 2.0" SCHD 80 PVC CONDUIT (DIRECTION.BORED) | 800 LF | |
| CATCH BASIN T-17 (CONVERT C.B. TYPE 5) | 13 EA | |
| CATCH BASIN T-18 (CONVERT C.B. TYPE 7) | 1 EA |
| BORROW EXCAVATION | 2,258.8 CY | |
| EXCAVATION FOR SHOULDER PAVING | 392.83 STA | |
| HAULING OF EXCAVATED SHOULDER MATERIAL | 392.83 STA |
| MOBILIZATION | 1 LS |
| REMOVAL & DISPOSAL OF EXISTING PAVEMENT | 5,370 SY |
| TRAFFIC CONTROL | 1 LS |
| PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) | 2,939 SF |
| BONDS AND INSURANCE | 1 LS | |
| MAINTENANCE STONE | 64 TON | |
| CEMENT MODIFIED RECYCLED BASE (14" UNIF)-CURING METHOD B | 20,298.67 SY | |
| PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE | 698.61 TON | |
| FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. | 1,200 SY | |
| FULL DEPTH ASPH. PAV. PATCHING 8" UNIF | 5,200 SY | |
| 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT | 73,320 LF | |
| WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT | 141 EA | |
| WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT | 72 EA | |
| WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT | 12 EA | |
| 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT | 26,880 LF | |
| 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT | 254,550 LF | |
| 4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT SLOW CURE | 2,620 LF | |
| 4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT SLOW | 10,470 LF | |
| 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. |
| 24,440 LF |
| 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. | 2,050 LF |
| 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL | 36 LF |
| 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL | 1,155 LF |
| WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. | 47 EA |
| WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. | 24 EA |
| WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL | 4 EA |
| 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. | 8,960 LF |
| PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" | 2,476 EA |
| PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. | 350 EA |
| PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" | 1,901 EA |
| MILLED-IN RUMBLE STRIP | 17.93 MI |
| FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) | 2,200 LF |
| FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE | 19,360 LF |
| F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD | 44 EA |
| FURNISH & INSTALL CABINET INTERFACE COMPONENTS FOR RADAR | 1 EA |
| DETECTABLE WARNING MATERIAL | 587.5 SF |
| PEDESTRIAN RAMP CONSTRUCTION | 1,175 SY |
| PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS | 7.52 ACRE |