Channel Erosion Repair-Grayson Co.
Grayson County · est $0.2M
Grayson County · est $0.2M
2 primes pulled plans · BK Field Operations LLC finishes low on 57% of TX earthwork bids it enters
Pulled plans2 primes
Likely also biddingTX earthwork regulars · 7
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid TX earthwork work in the last 5 years, ranked by frequency. Low-bid rate is historical — the share of bids where that firm finished rank one, not a verified award or a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · TxDOT
8 advertised pay items from the TxDOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 104-7006 | REMOV CONC (RIPRAP) | 241 SY |
| 400-7010 | CEM STABIL BKFL | 285 CY |
| 401-7001 | FLOWABLE BACKFILL | 28 CY |
| 432-7002 | RIPRAP (CONC)(5 IN) | 77 CY |
| 500-7001 | MOBILIZATION | Lump sum |
| 502-7001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 MO |
| 505-7001 | TMA (STATIONARY) | 26 DAY |
| 556-7006 | PIPE UNDERDRAINS (TY 6) (6") | 66 LF |