WF | US 190 | Lampasas CL | Clark Rd
Coryell County · est $128M
Coryell County · est $128M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | JAMES CONSTRUCTION GROUP, LLC | $107,409,195.00 | — |
| 2 | INDUS ROAD & BRIDGE, INC. | $112,729,962.70 | $5,320,767.70 |
| 3 | WEBBER, LLC | $119,182,905.00 | $11,773,710.00 |
| 4 | PULICE CONSTRUCTION, INC. | $120,346,064.21 | $12,936,869.21 |
| 5 | JORDAN FOSTER CONSTRUCTION, LLC | $122,658,398.27 | $15,249,203.27 |
| 6 | ORION CONSTRUCTION, LLC | $125,992,597.00 | $18,583,402.00 |
| 7 | GRANITE CONSTRUCTION COMPANY | $129,031,362.59 | $21,622,167.59 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 132-7006 EMBANK (FNL)(DC)(TY C) | 969,158 CY | $13.22 | $12.8M | 12% |
| 500-7001 MOBILIZATION | 1 LS | $8,093,376 | $8.09M | 8% |
| 100-7002 PREPARING ROW | 344 STA | $23,500 | $8.08M | 8% |
| 442-7001 STR STEEL (PLATE GIRDER) | 2,870,000 LB | $2.18 | $6.26M | 6% |
| 422-7001 REINF CONC SLAB | 201,516 SF | $25.33 | $5.10M | 5% |
| 346-7009 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 45,553 TON | $105.75 | $4.82M | 4% |
| 341-7001 D-GR HMA TY-B PG64-22 | 52,926 TON | $76 | $4.02M | 4% |
| 423-7001 RETAINING WALL (MSE) | 73,926 SF | $45.52 | $3.37M | 3% |
| 425-7043 PRESTR CONC U-BEAM (U54) | 9,473.28 LF | $347.51 | $3.29M | 3% |
| 247-7188 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) | 83,261 CY | $38.62 | $3.22M | 3% |