CR; Roberts Rd at Panther Creek
Wise County · est $1.0M
Wise County · est $1.0M
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | THK CONSTRUCTION LLC | $875,772.49 | — |
| 2 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $875,952.70 | $180.21 |
| 3 | BLACKSMITH VENTURES LLC | $947,250.40 | $71,477.91 |
| 4 | SKYLINE BRIDGE LLC | $966,060.25 | $90,287.76 |
| 5 | GARRET SHIELDS INFRASTRUCTURE | $974,364.20 | $98,591.71 |
| 6 | COPPELL CONSTRUCTION CO., INC. | $1,068,060.50 | $192,288.01 |
| 7 | TUCAN CONTRACTING, LLC | $1,145,255.08 | $269,482.59 |
| 8 | ED BELL CONSTRUCTION COMPANY | $1,364,933.75 | $489,161.26 |
| 9 | EARTH BUILDERS, L.P. | $1,526,752.50 | $650,980.01 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7047 RIPRAP (STONE PROTECTION)(30 IN) | 771 CY | $160 | $123k | 14% |
| 416-7006 DRILL SHAFT (36 IN) | 378 LF | $287.28 | $109k | 12% |
| 425-7001 PRESTR CONC GIRDER (TX28) | 297.93 LF | $333.02 | $99k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $90,000 | $90k | 10% |
| 422-7001 REINF CONC SLAB | 1,950 SF | $37 | $72k | 8% |
| 422-7013 APPROACH SLAB | 44.7 CY | $800 | $36k | 4% |
| 420-7012 CL C CONC (ABUT) | 31.6 CY | $1,100 | $35k | 4% |
| 341-7028 D-GR HMA TY-C SAC-B PG70-28 | 82 TON | $416.03 | $34k | 4% |
| 247-7067 FL BS (CMP IN PLC)(TY A GR 1-2) (8") | 738 SY | $40 | $30k | 3% |
| 100-7002 PREPARING ROW | 3.9 STA | $7,000 | $27k | 3% |