CR; CR 218 over Duffau CRK
Erath County · est $1.2M
Erath County · est $1.2M
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | THK CONSTRUCTION LLC | $976,095.21 | — |
| 2 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $1,003,229.50 | $27,134.29 |
| 3 | KNIFE RIVER CORPORATION - SOUTH | $1,050,910.10 | $74,814.89 |
| 4 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $1,163,366.25 | $187,271.04 |
| 5 | TUCAN CONTRACTING, LLC | $1,180,895.40 | $204,800.19 |
| 6 | STX CIVIL | $1,183,794.80 | $207,699.59 |
| 7 | GARRET SHIELDS INFRASTRUCTURE | $1,244,174.00 | $268,078.79 |
| 8 | COPPELL CONSTRUCTION CO., INC. | $1,510,352.50 | $534,257.29 |
| 9 | CASTILLO ARANDA LLC | $1,684,605.00 | $708,509.79 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 425-7019 PRESTR CONC SLAB BEAM (5SB15) | 592.5 LF | $368.52 | $218k | 22% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 638 CY | $160 | $102k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $100,000 | $100k | 10% |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 390 CY | $160 | $62k | 6% |
| 422-7008 REINF CONC SLAB (SLAB BEAM)(HPC) | 3,120 SF | $19 | $59k | 6% |
| 416-7004 DRILL SHAFT (24 IN) | 162 LF | $355.54 | $58k | 6% |
| 450-7025 RAIL (TY SSTR)(HPC) | 264 LF | $190 | $50k | 5% |
| 100-7002 PREPARING ROW | 3.95 STA | $7,800 | $31k | 3% |
| 422-7014 APPROACH SLAB (HPC) | 38.5 CY | $800 | $31k | 3% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 32 CY | $800 | $26k | 3% |