Village Creek Park Resurfacing (PR 74)
Hardin County · est $121k
Hardin County · est $121k
2 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TEXAS MATERIALS GROUP, INC. | $190,948.00 | — |
| 2 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | $258,151.95 | $67,203.95 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 316-7241 AGGR (TY-PB OR PL, GR-4)(SAC-A) | 113 CY | $522 | $59k | 31% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 204 SY | $137 | $28k | 15% |
| 316-7264 ASPH (AC 20-5TR OR AC-20XP OR CRS-2P) | 5,309 GAL | $4 | $21k | 11% |
| 531-7006 CURB RAMPS (TY 2) | 1 EA | $20,000 | $20k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $18,000 | $18k | 9% |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 8,350 LF | $1.5 | $13k | 7% |
| 150-7003 BLADING | 125 LF | $47 | $6k | 3% |
| 194-7008 RDSIDE AMENITY (WHEEL STOP REMOV&RESET) | 50 EA | $117 | $6k | 3% |
| 672-7004 REFL PAV MRKR TY II-A-A | 418 EA | $8 | $3k | 2% |
| 668-7103 PREFAB PM TY C (W)(WORD) | 8 EA | $404.75 | $3k | 2% |