FM 549 from SH 205 to SH 276
Rockwall County · est $35M
Rockwall County · est $35M
12 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | URBAN INFRACONSTRUCTION LLC | $29,812,033.71 | — |
| 2 | WEBBER, LLC | $31,956,748.63 | $2,144,714.92 |
| 3 | HIGHWAY 19 CONSTRUCTION LLC | $32,124,987.86 | $2,312,954.15 |
| 4 | ED BELL CONSTRUCTION COMPANY | $33,345,707.05 | $3,533,673.34 |
| 5 | HARPER BROTHERS CONSTRUCTION LLC | $33,779,105.36 | $3,967,071.65 |
| 6 | GREY SKY CONSTRUCTION LLC | $34,455,613.45 | $4,643,579.74 |
| 7 | GRANITE CONSTRUCTION COMPANY | $35,089,834.75 | $5,277,801.04 |
| 8 | MARIO SINACOLA & SONS EXCAVATING, INC. | $35,321,967.29 | $5,509,933.58 |
| 9 | MCMAHON CONTRACTING AND CONSTRUCTION, LLC | $37,441,520.98 | $7,629,487.27 |
| 10 | RAGLE CONSTRUCTION, INC. | $38,105,737.19 | $8,293,703.48 |
| 11 | INDUS ROAD & BRIDGE, INC. | $42,320,779.64 | $12,508,745.93 |
| 12 | COPASA INC | $44,776,051.12 | $14,964,017.41 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 360-7002 CONC PVMT (CRCP) (8") | 82,836 SY | $75 | $6.21M | 21% |
| 500-7001 MOBILIZATION | 1 LS | $2,368,401 | $2.37M | 8% |
| 344-7001 SP MIXES SP-B PG64-22 | 19,854 TON | $112.9 | $2.24M | 8% |
| 260-7005 LIME (COM OR QK)(SLURRY) | 3,832 TON | $292 | $1.12M | 4% |
| 531-7001 CONC SIDEWALKS (4") | 22,060 SY | $50 | $1.10M | 4% |
| 508-7001 CONSTRUCTING DETOURS | 9,570 SY | $113.73 | $1.09M | 4% |
| 464-7005 RC PIPE (CL III)(24 IN) | 8,613 LF | $125 | $1.08M | 4% |
| 110-7001 EXCAV (ROADWAY) | 76,938 CY | $13.65 | $1.05M | 4% |
| 260-7009 LIME TRT (EXIST MATL)(12") | 96,272 SY | $10 | $963k | 3% |
| 100-7002 PREPARING ROW | 109.7 STA | $5,000 | $549k | 2% |