SL 287_BU59G to Copeland St - FOI
Angelina County · est $13M
Angelina County · est $13M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | LONGVIEW BRIDGE AND ROAD, LTD. | $11,124,511.69 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $11,886,780.05 | $762,268.36 |
| 3 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | $12,101,915.75 | $977,404.06 |
| 4 | A. L. HELMCAMP, INC. | $13,582,047.42 | $2,457,535.73 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7004 SP MIXES SP-B PG70-22 | 15,340 TON | $170 | $2.61M | 23% |
| 344-7020 SP MIXES SP-C SAC-A PG70-22 | 11,174 TON | $180 | $2.01M | 18% |
| 500-7001 MOBILIZATION | 1 LS | $1,000,000 | $1.00M | 9% |
| 512-7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 9,120 LF | $82 | $748k | 7% |
| 100-7002 PREPARING ROW | 93 STA | $4,500 | $419k | 4% |
| 530-7006 DRIVEWAYS (CONC) | 2,054 SY | $150 | $308k | 3% |
| 514-7001 PERM CTB (SGL SLOPE) (TY 1) (42 ) | 3,216 LF | $90 | $289k | 3% |
| 112-7002 SUBGR WIDEN (DC) | 151 STA | $1,750 | $264k | 2% |
| 354-7051 PLANE ASPH CONC PAV(2") | 78,873 SY | $2.75 | $217k | 2% |
| 650-7038 INS OH SN SUP(35 FT CANT) | 4 EA | $46,000 | $184k | 2% |