IH 37: 0073-08-183; Foi
Bexar County · est $34M
Bexar County · est $34M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HUNTER INDUSTRIES, LTD. | $33,122,614.62 | — |
| 2 | JORDAN FOSTER CONSTRUCTION, LLC | $33,402,427.38 | $279,812.76 |
| 3 | CAPITAL EXCAVATION COMPANY | $34,315,676.20 | $1,193,061.58 |
| 4 | URBAN INFRACONSTRUCTION LLC | $34,417,509.27 | $1,294,894.65 |
| 5 | J3 COMPANY, LLC | $35,211,396.86 | $2,088,782.24 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $2,749,227 | $2.75M | 8% |
| 346-7001 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 | 15,182 TON | $169.4 | $2.57M | 8% |
| 341-7001 D-GR HMA TY-B PG64-22 | 21,800 TON | $101.2 | $2.21M | 7% |
| 423-7001 RETAINING WALL (MSE) | 31,007 SF | $53.5 | $1.66M | 5% |
| 344-7031 SP MIXES SP-C SAC-B PG76-22 | 9,610 TON | $113.3 | $1.09M | 3% |
| 508-7001 CONSTRUCTING DETOURS | 9,261 SY | $105.19 | $974k | 3% |
| 420-7057 CL C CONC (SIGN COLUMN) | 467 CY | $1,800 | $841k | 3% |
| 419-7001 SOUND WALL | 13,720 SF | $50.65 | $695k | 2% |
| 110-7001 EXCAV (ROADWAY) | 28,142 CY | $24.2 | $681k | 2% |
| 462-7076 CONC BOX CULV (8 FT X 4 FT)(EXTEND) | 838 LF | $734.22 | $615k | 2% |