CR 454 @ Bosque River
Erath County · est $1.1M
Erath County · est $1.1M
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STX CIVIL | $866,897.05 | — |
| 2 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $930,246.00 | $63,348.95 |
| 3 | TALBERT COMPANIES LLC | $990,346.35 | $123,449.30 |
| 4 | KNIFE RIVER CORPORATION - SOUTH | $1,034,056.95 | $167,159.90 |
| 5 | COPPELL CONSTRUCTION CO., INC. | $1,063,680.70 | $196,783.65 |
| 6 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $1,101,907.41 | $235,010.36 |
| 7 | C. E. BARKER, LTD. | $1,126,214.59 | $259,317.54 |
| 8 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $1,136,752.00 | $269,854.95 |
| 9 | URBAN INFRACONSTRUCTION LLC | $1,300,000.00 | $433,102.95 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 468 CY | $250 | $117k | 13% |
| 425-7001 PRESTR CONC GIRDER (TX28) | 238 LF | $450 | $107k | 12% |
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 559 SY | $180 | $101k | 12% |
| 416-7006 DRILL SHAFT (36 IN) | 256 LF | $380 | $97k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $68,000 | $68k | 8% |
| 422-7002 REINF CONC SLAB (HPC) | 1,920 SF | $28 | $54k | 6% |
| 344-7024 SP MIXES SP-C SAC-A PG70-28 | 97 TON | $450 | $44k | 5% |
| 422-7014 APPROACH SLAB (HPC) | 48.5 CY | $850 | $41k | 5% |
| 420-7013 CL C CONC (ABUT)(HPC) | 36.4 CY | $1,100 | $40k | 5% |
| 450-7020 RAIL (TY T631) | 152 LF | $160 | $24k | 3% |