SH 7 at Morral Creek (BR)
Nacogdoches County · est $7.4M
Nacogdoches County · est $7.4M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | THK CONSTRUCTION LLC | $6,230,927.11 | — |
| 2 | LONGVIEW BRIDGE AND ROAD, LTD. | $6,657,813.85 | $426,886.74 |
| 3 | A. L. HELMCAMP, INC. | $6,780,150.30 | $549,223.19 |
| 4 | HIGHWAY 19 CONSTRUCTION LLC | $7,114,128.00 | $883,200.89 |
| 5 | TRUE ROADS CONSTRUCTION LLC | $7,372,316.44 | $1,141,389.33 |
| 6 | ALTUS CONSTRUCTION LLC | $8,195,695.39 | $1,964,768.28 |
| 7 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $8,690,667.40 | $2,459,740.29 |
| 8 | BRICE HIGHWAY LLC | $9,773,671.52 | $3,542,744.41 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 508-7001 CONSTRUCTING DETOURS | 4,337 SY | $151.72 | $658k | 11% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 4,265 CY | $130 | $554k | 9% |
| 4012-7001 TEMPORARY DETOUR BRIDGE | 1 EA | $445,000 | $445k | 7% |
| 500-7001 MOBILIZATION | 1 LS | $400,000 | $400k | 6% |
| 344-7019 SP MIXES SP-C PG70-22 | 1,442 TON | $269.79 | $389k | 6% |
| 416-7006 DRILL SHAFT (36 IN) | 630 LF | $395.57 | $249k | 4% |
| 425-7002 PRESTR CONC GIRDER (TX34) | 1,013.54 LF | $237 | $240k | 4% |
| 425-7019 PRESTR CONC SLAB BEAM (5SB15) | 742.5 LF | $305 | $226k | 4% |
| 422-7001 REINF CONC SLAB | 12,420 SF | $17.78 | $221k | 4% |
| 160-7002 FURN & PLACE TOPSOIL (4") | 60,400 SY | $3 | $181k | 3% |