US 281; IH 20 to UPRR
Palo Pinto County · est $4.7M
Palo Pinto County · est $4.7M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TEXAS MATERIALS GROUP, INC. | $2,945,708.89 | — |
| 2 | JAGOE-PUBLIC COMPANY | $3,086,687.45 | $140,978.56 |
| 3 | FOUTSCO PAVING COMPANY, LLC | $3,272,162.97 | $326,454.08 |
| 4 | NORTHEASTERN PAVERS, LLC | $3,477,549.23 | $531,840.34 |
| 5 | A. L. HELMCAMP, INC. | $3,572,264.12 | $626,555.23 |
| 6 | PEACHTREE CONSTRUCTION, LTD. | $3,581,045.74 | $635,336.85 |
| 7 | DUININCK, INC. | $3,944,068.85 | $998,359.96 |
| 8 | OVERLAND CORPORATION | $4,078,205.00 | $1,132,496.11 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7024 SP MIXES SP-C SAC-A PG70-28 | 11,476 TON | $133 | $1.53M | 52% |
| 354-7002 PLANE & TEXT ASPH CONC PAV(0" TO 2") | 98,044 SY | $2.13 | $208k | 7% |
| 351-7014 FLEXIBLE PAVEMENT STRUCTURE REPAIR(15") | 1,600 SY | $101.57 | $163k | 6% |
| 500-7001 MOBILIZATION | 1 LS | $139,859 | $140k | 5% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 166 CY | $735.88 | $122k | 4% |
| 644-7004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 68 EA | $1,114 | $76k | 3% |
| 341-7046 D-GR HMA TY-D PG64-22 (LEVEL-UP) | 574 TON | $112.11 | $64k | 2% |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 20 EA | $3,058 | $61k | 2% |
| 752-7001 TREE TRIMMING / BRUSH REMOVAL | 4.14 MI | $14,510 | $60k | 2% |
| 134-7001 BACKFILL (TY A) | 219 STA | $233.97 |
| $51k |
| 2% |