FM 113; Old Millsap Rd
Parker County · est $1.4M
Parker County · est $1.4M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | JAY MILLS CONTRACTING, INCORPORATED | $1,351,258.56 | — |
| 2 | PRATER DIRT WORK LLC | $1,409,313.90 | $58,055.34 |
| 3 | JAGOE-PUBLIC COMPANY | $1,698,687.90 | $347,429.34 |
| 4 | TEXAS MATERIALS GROUP, INC. | $1,768,181.21 | $416,922.65 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7001 D-GR HMA TY-B PG64-22 | 1,200 TON | $154 | $185k | 14% |
| 132-7007 EMBANK (FNL)(OC)(TY C1) | 5,000 CY | $30 | $150k | 11% |
| 344-7024 SP MIXES SP-C SAC-A PG70-28 | 492 TON | $302.5 | $149k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $130,000 | $130k | 10% |
| 247-7176 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 1,547 CY | $72 | $111k | 8% |
| 530-7010 DRIVEWAYS (ACP) | 668 SY | $163 | $109k | 8% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $12,000 | $84k | 6% |
| 105-7012 RMV (12"-16") TRT/UNTRT BASE & ASPH PAV | 3,575 SY | $16 | $57k | 4% |
| 100-7002 PREPARING ROW | 10 STA | $4,000 | $40k | 3% |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $13,000 | $26k | 2% |