FM 4; at Weaver Branch
Hood County · est $2.7M
Hood County · est $2.7M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STX CIVIL | $2,382,295.20 | — |
| 2 | TALBERT COMPANIES LLC | $2,879,976.69 | $497,681.49 |
| 3 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $3,094,888.20 | $712,593.00 |
| 4 | C. E. BARKER, LTD. | $3,179,978.42 | $797,683.22 |
| 5 | URBAN INFRACONSTRUCTION LLC | $3,180,000.00 | $797,704.80 |
| 6 | COPPELL CONSTRUCTION CO., INC. | $3,186,925.52 | $804,630.32 |
| 7 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $3,241,067.75 | $858,772.55 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 1,295 CY | $190 | $246k | 10% |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 6,428 CY | $35 | $225k | 9% |
| 341-7001 D-GR HMA TY-B PG64-22 | 1,126 TON | $175 | $197k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $180,000 | $180k | 8% |
| 425-7003 PRESTR CONC GIRDER (TX40) | 447.36 LF | $300 | $134k | 6% |
| 344-7024 SP MIXES SP-C SAC-A PG70-28 | 365 TON | $250 | $91k | 4% |
| 247-7044 FL BS (CMP IN PLC)(TY A GR 1-2) (6") | 3,439 SY | $25 | $86k | 4% |
| 422-7002 REINF CONC SLAB (HPC) | 3,060 SF | $28 | $86k | 4% |
| 464-7011 RC PIPE (CL III)(48 IN) | 281 LF | $300 | $84k | 4% |
| 416-7006 DRILL SHAFT (36 IN) | 272 LF | $270 | $73k | 3% |