FM 3097 from East of Tubbs Rd to FM 549
Rockwall County · est $3.1M
Rockwall County · est $3.1M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TEXAS MATERIALS GROUP, INC. | $3,015,283.42 | — |
| 2 | ED BELL CONSTRUCTION COMPANY | $3,395,000.00 | $379,716.58 |
| 3 | FNH CONSTRUCTION, LLC | $3,604,268.00 | $588,984.58 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7021 SP MIXES SP-C SAC-B PG70-22 | 4,298 TON | $161 | $692k | 23% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 3,905 SY | $92 | $359k | 12% |
| 530-7007 DRIVEWAYS (CONC) (HES) | 2,343 SY | $132 | $309k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $300,049 | $300k | 10% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $18,755 | $188k | 6% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 172 CY | $800 | $138k | 5% |
| 100-7002 PREPARING ROW | 92.8 STA | $1,037 | $96k | 3% |
| 530-7010 DRIVEWAYS (ACP) | 831 SY | $104 | $86k | 3% |
| 247-7125 FL BS (CMP IN PLC)(TY D GR 1-2) (12") | 1,621 SY | $45 | $73k | 2% |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 19 EA | $3,200 | $61k | 2% |