0018-06, IH35 SBML OV
Webb County · est $11M
Webb County · est $11M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ANDERSON COLUMBIA CO., INC. | $10,599,419.72 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $11,203,168.82 | $603,749.10 |
| 3 | HUNTER INDUSTRIES, LTD. | $12,035,478.64 | $1,436,058.92 |
| 4 | CK NEWBERRY, LLC | $12,096,656.50 | $1,497,236.78 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 346-7001 STONE-MTRX-ASPH SMA-C SAC-A PG76-22 | 24,757 TON | $154 | $3.81M | 36% |
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 49,806 SY | $37 | $1.84M | 17% |
| 341-7031 D-GR HMA TY-C SAC-A PG76-22 | 12,924 TON | $125 | $1.62M | 15% |
| 500-7001 MOBILIZATION | 1 LS | $912,000 | $912k | 9% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 13,015 SY | $60 | $781k | 7% |
| 354-7052 PLANE ASPH CONC PAV(3") | 122,748 SY | $3.8 | $466k | 4% |
| 505-7002 TMA (MOBILE OPERATION) | 200 HR | $770 | $154k | 1% |
| 3007-7001 BONDING COURSE | 45,387 GAL | $2.5 | $113k | 1% |
| 354-7082 PLANE ASPH CONC PAV (2.5") | 32,779 SY | $2.7 | $89k | 1% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 102 CY | $740 | $75k |
| 1% |