0299-14, SL 480 New Non-Freeway
Maverick County · est $132M
Maverick County · est $132M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HUNTER INDUSTRIES, LTD. | $93,685,506.85 | — |
| 2 | POSILLICO CIVIL, INC. | $104,049,675.40 | $10,364,168.55 |
| 3 | ANDERSON COLUMBIA CO., INC. | $108,444,495.57 | $14,758,988.72 |
| 4 | WEBBER, LLC | $115,893,120.24 | $22,207,613.39 |
| 5 | JAMES CONSTRUCTION GROUP, LLC | $117,664,941.00 | $23,979,434.15 |
| 6 | IOC COMPANY LLC | $118,328,068.14 | $24,642,561.29 |
| 7 | PULICE CONSTRUCTION, INC. | $129,770,434.82 | $36,084,927.97 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $7,713,645 | $7.71M | 8% |
| 110-7001 EXCAV (ROADWAY) | 758,242 CY | $8.74 | $6.63M | 7% |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 914,192 CY | $6.45 | $5.90M | 6% |
| 341-7007 D-GR HMA TY-B SAC-B PG70-22 | 63,732 TON | $89.34 | $5.69M | 6% |
| 422-7001 REINF CONC SLAB | 202,874 SF | $26 | $5.27M | 6% |
| 360-7006 CONC PVMT (CRCP) (12") | 29,190 SY | $152 | $4.44M | 5% |
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 272,015 SY | $15.99 | $4.35M | 5% |
| 425-7005 PRESTR CONC GIRDER (TX54) | 23,105.84 LF | $180 | $4.16M | 4% |
| 344-7030 SP MIXES SP-C SAC-A PG76-22 | 41,185 TON | $100.53 | $4.14M | 4% |
| 247-7044 FL BS (CMP IN PLC)(TY A GR 1-2) (6") | 307,101 SY | $9.63 | $2.96M | 3% |