US285_0.7MI_N_Gomez_Rd_1.8 MI N IH 10
Pecos County · est $40M
Pecos County · est $40M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | $26,858,499.32 | — |
| 2 | REECE ALBERT, INC. | $28,265,792.58 | $1,407,293.26 |
| 3 | A. L. HELMCAMP, INC. | $34,382,889.44 | $7,524,390.12 |
| 4 | CK NEWBERRY, LLC | $34,480,274.98 | $7,621,775.66 |
| 5 | FNF CONSTRUCTION, INC. | $37,066,726.90 | $10,208,227.58 |
| 6 | KIEWIT INFRASTRUCTURE SOUTH CO. | $38,593,349.92 | $11,734,850.60 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7005 SP MIXES SP-B SAC-B PG70-22 | 86,840 TON | $85.39 | $7.42M | 28% |
| 346-7023 STONE-MTRX-ASPH SMAR-F SAC-A | 25,564 TON | $127 | $3.25M | 12% |
| 500-7001 MOBILIZATION | 1 LS | $1,500,000 | $1.50M | 6% |
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 28,131 SY | $41.5 | $1.17M | 4% |
| 247-7345 FL BS (CMP IN PLC)(TY A GR 4)(5") | 179,731 SY | $6.42 | $1.15M | 4% |
| 110-7001 EXCAV (ROADWAY) | 79,600 CY | $14 | $1.11M | 4% |
| 432-7002 RIPRAP (CONC)(5 IN) | 1,083.8 CY | $603.75 | $654k | 2% |
| 462-7015 CONC BOX CULV (7 FT X 3 FT) | 645 LF | $951.56 | $614k | 2% |
| 467-7154 SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1)(C) | 56 EA | $9,939 | $557k | 2% |
| 462-7070 CONC BOX CULV (7 FT X 3 FT)(EXTEND) | 494 LF | $918.07 |
| $454k |
| 2% |