SH 288: SH 6 to FM 1462
Brazoria County · est $5.3M
Brazoria County · est $5.3M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ALLSTATE SIGNAL & CONSTRUCTION, LLC | $4,367,855.06 | — |
| 2 | THIRD COAST SERVICES LLC | $4,545,633.16 | $177,778.10 |
| 3 | SICE, INC. | $4,771,299.93 | $403,444.87 |
| 4 | THE LEVY COMPANY, LLC | $5,817,111.63 | $1,449,256.57 |
| 5 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $7,595,734.45 | $3,227,879.39 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 619-7003 ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE) | 47,835 LF | $24.03 | $1.15M | 26% |
| 618-7038 CONDT (PVC) (SCH 40) (3") (CONC ENCSE) | 50,445 LF | $13.77 | $695k | 16% |
| 623-7002 ITS GND BOX(PCAST) TY 1 (243636)W/APRN | 80 EA | $4,586 | $367k | 8% |
| 619-7008 ITS MULTI-DUCT CND (RMC) | 2,458 LF | $106.19 | $261k | 6% |
| 619-7006 ITS MULTI-DUCT CND (PVC-80)(BORE) | 3,675 LF | $46.83 | $172k | 4% |
| 6011-7027 ITS POLE (55 FT)(110 MPH) | 8 EA | $20,625 | $165k | 4% |
| 650-7035 INS OH SN SUP(35 FT BAL TEE) | 3 EA | $51,850 | $156k | 4% |
| 618-7061 CONDT (PVC) (SCH 80) (3") (BORE) | 3,675 LF | $37.2 | $137k | 3% |
| 6027-7006 FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER) | 50,020 LF | $2.73 | $137k | 3% |
| 6053-7001 COMMUNICATIONS HUB BUILDING |
| 4 EA |
| $34,000 |
| $136k |
| 3% |