FM 2039 at Porter Creek - BR
Burleson County · est $2.4M
Burleson County · est $2.4M
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | LARRY YOUNG PAVING, INC. | $2,315,333.30 | — |
| 2 | STX CIVIL | $2,373,773.35 | $58,440.05 |
| 3 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $2,508,181.82 | $192,848.52 |
| 4 | R CONSTRUCTION CIVIL, LLC | $2,594,066.93 | $278,733.63 |
| 5 | KNIFE RIVER CORPORATION - SOUTH | $2,612,038.45 | $296,705.15 |
| 6 | TEXAS MATERIALS GROUP, INC. | $2,782,467.85 | $467,134.55 |
| 7 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $2,948,269.70 | $632,936.40 |
| 8 | C. E. BARKER, LTD. | $3,748,865.20 | $1,433,531.90 |
| 9 | FUQUA CONSTRUCTION CO., INC. | $4,259,517.05 | $1,944,183.75 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 1,287 CY | $170 | $219k | 9% |
| 462-7038 CONC BOX CULV (10 FT X 10 FT) | 128 LF | $1,500 | $192k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $180,000 | $180k | 8% |
| 403-7001 TEMPORARY SPL SHORING | 3,611 SF | $36 | $130k | 6% |
| 466-7184 WINGWALL (PW - 1) (HW=14 FT) | 1 EA | $110,000 | $110k | 5% |
| 247-7067 FL BS (CMP IN PLC)(TY A GR 1-2) (8") | 3,036 SY | $36 | $109k | 5% |
| 425-7018 PRESTR CONC SLAB BEAM (4SB15) | 396 LF | $250 | $99k | 4% |
| 466-7183 WINGWALL (PW - 1) (HW=13 FT) | 1 EA | $96,000 | $96k | 4% |
| 344-7010 SP MIXES SP-C SAC-A PG64-22 | 380 TON | $190 | $72k | 3% |
| 422-7013 APPROACH SLAB | 65 CY | $1,000 | $65k | 3% |