FM 624 Nueces CR73 to Wildcat Add Lanes.
Nueces County · est $36M
Nueces County · est $36M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | J E CONSTRUCTION SERVICES, LLC | $30,814,865.00 | — |
| 2 | ANDERSON COLUMBIA CO., INC. | $36,254,638.00 | $5,439,773.00 |
| 3 | BAY LTD. | $36,385,205.94 | $5,570,340.94 |
| 4 | J. CARROLL WEAVER, INC. | $38,126,364.91 | $7,311,499.91 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $2,675,200 | $2.68M | 9% |
| 341-7002 D-GR HMA TY-B SAC-B PG64-22 | 15,670 TON | $129 | $2.02M | 7% |
| 341-7045 D-GR HMA TY-D SAC-B PG64-22 | 13,727 TON | $117 | $1.61M | 5% |
| 247-7113 FL BS (CMP IN PLC)(TY A GR 1-2) (12") | 34,429 SY | $39 | $1.34M | 4% |
| 536-7002 CONC MEDIAN | 14,672 SY | $90 | $1.32M | 4% |
| 100-7002 PREPARING ROW | 141 STA | $9,004 | $1.27M | 4% |
| 531-7001 CONC SIDEWALKS (4") | 22,358 SY | $55 | $1.23M | 4% |
| 462-7015 CONC BOX CULV (7 FT X 3 FT) | 2,019 LF | $595 | $1.20M | 4% |
| 530-7006 DRIVEWAYS (CONC) | 13,319 SY | $82 | $1.09M | 4% |
| 464-7005 RC PIPE (CL III)(24 IN) | 10,721 LF | $92 | $986k | 3% |