RER | 2401 |SH 171 |N Second - Limestone
Hill County · est $4.1M
Hill County · est $4.1M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BIG CREEK CONSTRUCTION, LTD. | $3,387,033.31 | — |
| 2 | KNIFE RIVER CORPORATION - SOUTH | $3,518,100.61 | $131,067.30 |
| 3 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | $4,420,114.10 | $1,033,080.79 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7021 SP MIXES SP-C SAC-B PG70-22 | 14,089 TON | $87 | $1.23M | 36% |
| 344-7001 SP MIXES SP-B PG64-22 | 13,197 TON | $83 | $1.10M | 32% |
| 354-7077 PLANE ASPH CONC PAV(1.5" - 3.5") | 90,627 SY | $2.5 | $227k | 7% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 4,500 SY | $45 | $203k | 6% |
| 500-7001 MOBILIZATION | 1 LS | $200,000 | $200k | 6% |
| 3006-7001 UNDERSEAL COURSE | 28,355 GAL | $3.5 | $99k | 3% |
| 354-7051 PLANE ASPH CONC PAV(2") | 22,749 SY | $2.85 | $65k | 2% |
| 134-7002 BACKFILL (TY B) | 216 STA | $250 | $54k | 2% |
| 132-7015 EMBANK (VEH)(OC)(TY B) | 851 CY | $40 | $34k | 1% |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 51,224 LF | $0.55 | $28k | 1% |