FM 239 Bridge Replacement 2307
De Witt County · est $1.0M
De Witt County · est $1.0M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | E-Z BEL CONSTRUCTION, LLC | $883,521.20 | — |
| 2 | HUNTER INDUSTRIES, LTD. | $914,064.07 | $30,542.87 |
| 3 | STX CIVIL | $1,065,336.55 | $181,815.35 |
| 4 | ACME BRIDGE COMPANY, INC. | $1,095,395.52 | $211,874.32 |
| 5 | CLARK CONSTRUCTION OF TEXAS, INC. | $1,154,678.16 | $271,156.96 |
| 6 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $1,214,369.11 | $330,847.91 |
| 7 | CONSTAR CONSTRUCTION | $1,296,436.50 | $412,915.30 |
| 8 | LUCANIA CONTRACTORS LLC | $1,414,657.70 | $531,136.50 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 462-7015 CONC BOX CULV (7 FT X 3 FT) | 372.5 LF | $790 | $294k | 33% |
| 341-7006 D-GR HMA TY-B PG70-22 | 776.9 TON | $140 | $109k | 12% |
| 467-7153 SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1)(C) | 16 EA | $6,500 | $104k | 12% |
| 500-7001 MOBILIZATION | 1 LS | $75,000 | $75k | 8% |
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 177.2 TON | $175 | $31k | 4% |
| 512-7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 1,340 LF | $23 | $31k | 3% |
| 552-7001 WIRE FENCE (TY A) | 981 LF | $28 | $27k | 3% |
| 316-7229 AGGR (TY-PE, GR-3)(SAC-B) | 20.3 CY | $1,000 | $20k | 2% |
| 512-7057 PORT CTB (REMOVE)(LOW PROF)(TY 1) | 1,340 LF | $12.5 | $17k | 2% |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 14.3 CY | $1,000 | $14k | 2% |