BR | @ Williams Creek |(Map #2)
Limestone County · est $2.2M
Limestone County · est $2.2M
10 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TUCAN CONTRACTING, LLC | $1,810,422.59 | — |
| 2 | BLACKSMITH VENTURES LLC | $1,911,843.01 | $101,420.42 |
| 3 | C & W SOUTHERN LLC | $1,927,247.50 | $116,824.91 |
| 4 | GARRET SHIELDS INFRASTRUCTURE | $1,934,999.20 | $124,576.61 |
| 5 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $1,982,743.80 | $172,321.21 |
| 6 | SKYLINE BRIDGE LLC | $1,983,586.20 | $173,163.61 |
| 7 | R CONSTRUCTION CIVIL, LLC | $2,052,481.50 | $242,058.91 |
| 8 | KNIFE RIVER CORPORATION - SOUTH | $2,264,806.27 | $454,383.68 |
| 9 | BIG CREEK CONSTRUCTION, LTD. | $2,475,638.83 | $665,216.24 |
| 10 | JAMES CONSTRUCTION GROUP, LLC | $3,132,701.00 | $1,322,278.41 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 425-7026 PRESTR CONC BOX BEAM (4B20) | 474 LF | $336.4 | $159k | 9% |
| 450-7008 RAIL (TY T223) | 724 LF | $165 | $119k | 7% |
| 425-7019 PRESTR CONC SLAB BEAM (5SB15) | 542.5 LF | $209.63 | $114k | 6% |
| 422-7007 REINF CONC SLAB (SLAB BEAM) | 4,940 SF | $22 | $109k | 6% |
| 416-7004 DRILL SHAFT (24 IN) | 471 LF | $220 | $104k | 6% |
| 420-7012 CL C CONC (ABUT) | 85.6 CY | $1,210 | $104k | 6% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 664 CY | $154 | $102k | 6% |
| 500-7001 MOBILIZATION | 1 LS | $100,000 | $100k | 6% |
| 425-7017 PRESTR CONC SLAB BEAM (5SB12) | 395 LF | $209.63 | $83k | 5% |
| 425-7027 PRESTR CONC BOX BEAM (5B20) | 237 LF | $336.4 | $80k | 4% |