BR | CR 254 @ Perry Creek |(Map #82)
Limestone County · est $2.3M
Limestone County · est $2.3M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TUCAN CONTRACTING, LLC | $2,080,557.94 | — |
| 2 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $2,167,348.33 | $86,790.39 |
| 3 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $2,377,286.00 | $296,728.06 |
| 4 | KNIFE RIVER CORPORATION - SOUTH | $2,459,291.70 | $378,733.76 |
| 5 | PMCO CONSTRUCTION LLC | $2,534,874.00 | $454,316.06 |
| 6 | YOKO EXCAVATING, LLC | $2,819,410.09 | $738,852.15 |
| 7 | PRESIDIO CONTRACTING, LLC | $2,881,521.82 | $800,963.88 |
| 8 | JOE BLAND CONSTRUCTION LLC | $3,038,937.00 | $958,379.06 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 1,694 CY | $147.15 | $249k | 12% |
| 416-7004 DRILL SHAFT (24 IN) | 1,185 LF | $206.46 | $245k | 12% |
| 425-7019 PRESTR CONC SLAB BEAM (5SB15) | 617.5 LF | $281.85 | $174k | 8% |
| 450-7008 RAIL (TY T223) | 690 LF | $196.2 | $135k | 7% |
| 420-7012 CL C CONC (ABUT) | 106.8 CY | $1,090 | $116k | 6% |
| 422-7007 REINF CONC SLAB (SLAB BEAM) | 5,200 SF | $21.8 | $113k | 5% |
| 425-7017 PRESTR CONC SLAB BEAM (5SB12) | 370 LF | $273.09 | $101k | 5% |
| 500-7001 MOBILIZATION | 1 LS | $100,000 | $100k | 5% |
| 425-7028 PRESTR CONC BOX BEAM (4B28) | 298 LF | $283.76 | $85k | 4% |
| 400-7010 CEM STABIL BKFL | 350 CY | $196.2 | $69k | 3% |