Rer | FM 1829 | US 84 | FM 107
Coryell County · est $5.6M
Coryell County · est $5.6M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BIG CREEK CONSTRUCTION, LTD. | $4,787,271.59 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $5,167,109.53 | $379,837.94 |
| 3 | KNIFE RIVER CORPORATION - SOUTH | $5,342,312.65 | $555,041.06 |
| 4 | TTG UTILITIES, INC. | $5,498,498.00 | $711,226.41 |
| 5 | JAMES CONSTRUCTION GROUP, LLC | $6,031,382.00 | $1,244,110.41 |
| 6 | C. E. BARKER, LTD. | $7,263,534.76 | $2,476,263.17 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 247-7188 FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) | 10,040 CY | $60 | $602k | 13% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 3,117 CY | $150 | $468k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $372,000 | $372k | 8% |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 9,599 CY | $25 | $240k | 5% |
| 314-7004 EMULS ASPH (BS OR SUBGR TRT)(CSS-1H) | 70,189 GAL | $3.4 | $239k | 5% |
| 247-7272 FL BS (RDWY DEL)(TY D GR 3)(FINAL POS) | 4,822 CY | $47 | $227k | 5% |
| 422-7001 REINF CONC SLAB | 7,600 SF | $28 | $213k | 4% |
| 425-7003 PRESTR CONC GIRDER (TX40) | 944.75 LF | $220 | $208k | 4% |
| 416-7006 DRILL SHAFT (36 IN) | 650 LF | $300 | $195k | 4% |
| 420-7013 CL C CONC (ABUT)(HPC) | 111.2 CY | $1,280 | $142k |
| 3% |