Rer | SS 579 | SH 81 | IH 35
Hill County · est $4.1M
Hill County · est $4.1M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | KNIFE RIVER CORPORATION - SOUTH | $3,553,261.05 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $3,747,961.28 | $194,700.23 |
| 3 | BIG CREEK CONSTRUCTION, LTD. | $4,063,085.90 | $509,824.85 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7031 SP MIXES SP-C SAC-B PG76-22 | 10,825 TON | $129 | $1.40M | 39% |
| 361-7052 FULL DEPTH CONCRETE REPAIR CPCD (8") | 2,302 SY | $246.75 | $568k | 16% |
| 500-7001 MOBILIZATION | 1 LS | $355,000 | $355k | 10% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 5,008 SY | $55.8 | $279k | 8% |
| 316-7001 ASPH (A-R TYPE II) | 38,905 GAL | $5.45 | $212k | 6% |
| 316-7253 AGGR (TY-D OR L, GR-4) | 465 CY | $211.95 | $99k | 3% |
| 467-7143 SET (TY I)(S= 6 FT)(HW= 8 FT)(3:1)(C) | 4 EA | $23,685 | $95k | 3% |
| 354-7033 PLANE ASPH CONC PAV(0" TO 3") | 43,195 SY | $1.25 | $54k | 2% |
| 545-7018 CCA (INSTL)(N)(TL3)(WORK ZONE) | 4 EA | $10,600 | $42k | 1% |
| 251-7049 REWORK BS MTL (TY C)(6")(ORD COMP) | 9,197 SY | $3 | $28k | 1% |