SH 211: 3544-04-011: OV
Bexar County · est $3.3M
Bexar County · est $3.3M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BOBCAT SERVICES, INC. | $2,498,077.69 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $2,535,514.62 | $37,436.93 |
| 3 | H. L. ZUMWALT CONSTRUCTION, INC. | $2,686,775.76 | $188,698.07 |
| 4 | DEAN WORD COMPANY, LTD. | $2,834,029.81 | $335,952.12 |
| 5 | LONE STAR PAVING COMPANY | $2,858,515.62 | $360,437.93 |
| 6 | HUNTER INDUSTRIES, LTD. | $3,131,752.51 | $633,674.82 |
| 7 | ALLEN KELLER COMPANY | $3,658,575.85 | $1,160,498.16 |
| 8 | CLARK CONSTRUCTION OF TEXAS, INC. | $3,943,248.10 | $1,445,170.41 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7031 SP MIXES SP-C SAC-B PG76-22 | 12,339 TON | $69 | $851k | 34% |
| 351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 19,142 SY | $23.4 | $448k | 18% |
| 341-7059 D-GR HMA TY-D PG76-22 (LEVEL-UP) | 2,297 TON | $82 | $188k | 8% |
| 354-7051 PLANE ASPH CONC PAV(2") | 107,296 SY | $1.5 | $161k | 6% |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 292 CY | $473 | $138k | 6% |
| 500-7001 MOBILIZATION | 1 LS | $130,500 | $131k | 5% |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 3,062.5 LF | $25.5 | $78k | 3% |
| 3006-7001 UNDERSEAL COURSE | 25,288 GAL | $2.9 | $73k | 3% |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 15 EA | $3,309 | $50k | 2% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $6,700 | $40k |
| 2% |