Victory Station At IH 35E SBFR
Dallas County · est $1.3M
Dallas County · est $1.3M
9 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | GARRET SHIELDS INFRASTRUCTURE | $1,177,499.75 | — |
| 2 | YOKO EXCAVATING, LLC | $1,183,544.01 | $6,044.26 |
| 3 | RAGLE CONSTRUCTION, INC. | $1,186,544.95 | $9,045.20 |
| 4 | AXIS CONTRACTING, INC. | $1,219,952.77 | $42,453.02 |
| 5 | WG ENGINEERING & CONSTRUCTION, LLC | $1,230,041.50 | $52,541.75 |
| 6 | GIBSON & ASSOCIATES, INC. | $1,276,196.18 | $98,696.43 |
| 7 | ED BELL CONSTRUCTION COMPANY | $1,332,947.85 | $155,448.10 |
| 8 | TUCAN CONTRACTING, LLC | $1,411,847.91 | $234,348.16 |
| 9 | JR WEST TEXAS CONCRETE LLC | $1,553,329.40 | $375,829.65 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 423-7001 RETAINING WALL (MSE) | 3,391 SF | $100 | $339k | 29% |
| 500-7001 MOBILIZATION | 1 LS | $100,000 | $100k | 8% |
| 6067-7002 AUTOMATED PEDESTRIAN DETECTION SYSTEM | 1 EA | $100,000 | $100k | 8% |
| 6099-7001 PEDESTRAIN ILLUMINATION ASSEMBLY | 11 EA | $7,000 | $77k | 7% |
| 450-7062 RAIL (HANDRAIL)(TY E) | 414 LF | $180 | $75k | 6% |
| 531-7003 CONC SIDEWALKS (6") | 677 SY | $100 | $68k | 6% |
| 432-7001 RIPRAP (CONC)(4 IN) | 72 CY | $600 | $43k | 4% |
| 687-7001 PED POLE ASSEMBLY | 2 EA | $15,000 | $30k | 3% |
| 618-7030 CONDT (PVC) (SCH 40) (2") | 1,170 LF | $25 | $29k | 2% |
| 104-7006 REMOV CONC (RIPRAP) | 1,371 SY | $20 | $27k | 2% |