FM 72 at Spring Creek Bridge
Irion County · est $5.2M
Irion County · est $5.2M
10 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | DELGADO'S CONTRACTORS, LLC | $4,405,520.94 | — |
| 2 | SKYLINE BRIDGE LLC | $4,543,260.96 | $137,740.02 |
| 3 | RELMCO, INC. | $4,940,156.95 | $534,636.01 |
| 4 | E-Z BEL CONSTRUCTION, LLC | $5,308,258.00 | $902,737.06 |
| 5 | TUCAN CONTRACTING, LLC | $5,534,673.05 | $1,129,152.11 |
| 6 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $5,539,335.07 | $1,133,814.13 |
| 7 | ALTUS CONSTRUCTION LLC | $5,958,482.55 | $1,552,961.61 |
| 8 | EARTH BUILDERS, L.P. | $7,647,572.00 | $3,242,051.06 |
| 9 | ACME BRIDGE COMPANY, INC. | $7,656,518.31 | $3,250,997.37 |
| 10 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $7,703,009.43 | $3,297,488.49 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442-7001 STR STEEL (PLATE GIRDER) | 701,199.6 LB | $2.4 | $1.68M | 38% |
| 422-7001 REINF CONC SLAB | 13,680 SF | $30.5 | $417k | 9% |
| 500-7001 MOBILIZATION | 1 LS | $200,000 | $200k | 5% |
| 432-7002 RIPRAP (CONC)(5 IN) | 273.6 CY | $650 | $178k | 4% |
| 420-7012 CL C CONC (ABUT) | 78 CY | $1,800 | $140k | 3% |
| 416-7007 DRILL SHAFT (42 IN) | 256 LF | $500 | $128k | 3% |
| 450-7008 RAIL (TY T223) | 796 LF | $150 | $119k | 3% |
| 422-7013 APPROACH SLAB | 92.2 CY | $1,200 | $111k | 3% |
| 110-7001 EXCAV (ROADWAY) | 4,223 CY | $25 | $106k | 2% |
| 341-7037 D-GR HMA TY-C SAC-B PG70-22 (EXEMPT) | 369 TON | $275 | $101k | 2% |