FM 2100: San Jacinto Canal to BU 90U
Harris County · est $1.6M
Harris County · est $1.6M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | FORDE CONSTRUCTION COMPANY, INC. | $1,798,696.38 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $1,824,787.10 | $26,090.72 |
| 3 | ENVIRONMENTAL ALLIES, INC. | $1,909,874.90 | $111,178.52 |
| 4 | DURWOOD GREENE CONSTRUCTION CO. | $1,948,559.29 | $149,862.91 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7064 SP MIXES SP-D SAC-A PG76-22 | 3,742 TON | $153 | $573k | 32% |
| 351-7011 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") | 1,766 SY | $110 | $194k | 11% |
| 354-7074 PLANE ASPH CONC PAV (1.5") | 45,357 SY | $3.75 | $170k | 9% |
| 3017-7001 CONTINUOUS GRINDING-CONCRETE PAVEMENT | 19,250 SY | $8.5 | $164k | 9% |
| 500-7001 MOBILIZATION | 1 LS | $122,000 | $122k | 7% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $22,000 | $88k | 5% |
| 316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B) | 349 CY | $250 | $87k | 5% |
| 316-7067 ASPH (AC-20-5TR OR AC-20XP) | 16,328 GAL | $3.2 | $52k | 3% |
| 662-7051 WK ZN PAV MRK REMOV (REFL) TY II-A-A | 8,906 EA | $4.5 | $40k | 2% |
| 6006-7001 VIVDS PROSR SYS | 3 EA | $12,200 |
| $37k |
| 2% |